Green Progress in The Meadows

Further to a post celebrating progress by Nottingham city, a short summary of the progress in The Meadows, with an update on Project Sensible and a link to the Jeremy Corbyn video that draws heavily from experience in The Meadows.

Such green achievements in The Meadows include –
– bus priority measures – the bus lane along Meadows Way East;
– tram services at 3 stops in The Meadows plus ‘ng2’ and Midland station;
– decades of taking heat from waste before landfill at Eastcroft (Meadows);
– new green housing off Green Street, and off Wilford Crescent West; and new green council housing in the west of The New Meadows; and and an exemplar green house;.
– helping solar panels to be installed on properties, by both NCH and MOzES – the Meadows own energy services company;
– a hundred and more enjoying lower price energy using a council owned business – Robin Hood Energy – whose income is ploughed back into lower prices, and have amongst the cheapest pre-payment schemes;
– planning policies to reduce the need to travel, and improvements to walking and cycling routes; to require greener buildings, including in the newest council housing;
– warmer homes through the decent homes programmes for council housing;
– energy efficient street lighting; with new lighting being provided at the end of this month for walkers and cyclists using Victoria Embankment;
– simple recycling (mainly doorstep) available to every household;
– schools involved in growing their own food (Greenfields and (I think) Victoria (ex-Riverside);
– testing the use of batteries to store energy rather than immediately send it into the grid (Project SENSIBLE).

On Project SENSIBLE, Julian Marsh reports
“The tenders for the domestic batteries and monitoring systems is currently being sought with prices expected back at the end of the month. This will enable us to firm up on numbers. It is hoped that we can start the meetings with the final volunteers in November and December and then begin the installations at the beginning of the New Year.
“The School system is currently having its tender documents put together and this will be tendered mid-October. Installation will either be Christmas or Easter in the School breaks.
“The Mundella Building is currently having its performance specification finalised and prices for that will be put forward by the Design and Build Contractor.
“Some of you will have been at the Meadows Library … to hear Jeremy Corbyn launch what we hope will be the Labour Party policy on energy – based largely on a community model. Mozes has helped by putting forward ideas for this and so we got the honour of being the location for the press release and for the attached little film which focusses specifically on what we are doing in the Meadows.”

simmo-on-hunter-street-b0477h

The video can be seen at – https://youtu.be/y5t8m1RXG9A

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s